Raptor crew working a steep two-storey roof with full ladder and safety setup

Steep and Complex Roof Replacement

12/12 pitches, three-storey eaves, dormers and intersecting valleys. The jobs other crews turn down are the ones this crew is proudest of.

Call to book your free assessment.

4.9 ★ on Google55 five-star reviews
10-year warrantyOn our workmanship
CertifiedMalarkey + IKO RoofPro Select
HomeRoof Replacement › Steep & Complex Roofs

Steep roofs are a different sport

We replace steep, tall and complicated shingle roofs across Dawson Creek, Fort St John and the South Peace. On a 12/12 pitch you can't use a picker, so bundles get carried up by hand, and the day starts with anchors, ropes, scaffolding and jacks before the first shingle moves.

Steep work punishes shortcuts. It's exactly where our six-nails-per-shingle standard and photo-documented quality control earn their keep, and why the same replacement process applies whether your roof is a bungalow or a three-storey.

The Dean standard

Fort St John

Dean's custom mansion is the most expensive residential roof we've ever done: an $85,000 scope on a 12/12 roof that hit 3 storeys at the eave and 4.5 at the peak. Every bundle went up by hand. Tarps ran from the gutters to the ground so tar never touched the immaculate vinyl siding.

Where multiple valleys intersected and went flat for about 10 by 10 feet, we brought in Stone River Contracting for torch-on, because that spot needed the right product, not a shingle shortcut. After final inspection Dean told Chris he'd looked high and low for one little flaw and couldn't find one. Read it in full on our reviews page, or see more Fort St John work.

How we take on a steep roof

Walk it before we price it

Steep and complex roofs get planned in person. The estimate shows where the extra time and safety setup goes, with every material priced.

Ropes before roofing

Tanner is first up, setting anchors and ropes for the rest of the crew. Nobody works until the safety setup is done.

Protect everything below

Tarps and planning keep siding, decks and landscaping out of the line of fire. On Dean's house, tar never touched the vinyl.

Muscle where machines can't go

On a true 12/12 a picker is useless, so bundles go up by hand and the work runs off scaffolding, ladders and jacks.

The same standard, all the way up

Six nails per shingle, triple waterproofing, photo-documented quality control and a 10-year workmanship warranty. Pitch doesn't change the promise.

Not every roof is a rectangle

Dormers, arches, prow fronts, three-storey eaves. If shingles can go on it, we've probably put them there. And when a section truly calls for another product, like torch-on where valleys go flat, we bring in a partner we trust instead of forcing it.

Stacked ladders reaching the top section of a three-storey house, deck protected by tarps, crew working above
Three storeys of ladders and a tarped deck below. Steep work is planned work.
Roofer working at the crest of a full barn arch roof with ladders set against the curve
A full barn arch mid-reshingle. The jobs other crews turn down.

What complex roofs get from us

  • Real safety setup. Anchors, ropes, scaffolding and roof jacks before anyone works.
  • Hand-carried bundles. When machines can't reach, muscle does.
  • Siding and landscaping protection. Planned before tear-off, not improvised after.
  • The right product in every spot. Including partner torch-on where shingles don't belong.
  • The same 10-year workmanship warranty. Complexity doesn't water down the promise.

And the same estimate as every replacement

Silver, Gold and Platinum packages with every material listed and priced, only four possible extras named up front with their cost, and a personal cover letter that explains it all, links our reviews and mentions financing options if you need them.

Steep and complex roof questions

Is my roof too steep for you?

No. A 12/12 pitch with dormers is routine for this crew. Tanner is first up every steep roof to set anchors and ropes, and the rest of the work runs off that setup.

Does a steep roof cost more?

Steep and complex roofs take more time, more safety setup and more hand work, and your estimate shows exactly where. Every material is listed and priced, and any possible extra is named up front.

How do you protect my siding and yard?

On Dean's mansion we ran tarps from the gutters all the way to the ground so tar never touched the vinyl siding. Protection gets planned before tear-off, and the site is left clean every single day.

What about flat sections and tricky valleys?

The right product goes in the right spot. Where Dean's valleys went flat, we brought in Stone River Contracting for proper torch-on instead of forcing shingles to do a job they can't. See our partners.

Got the roof other crews avoid?

Send us the steep one. A free assessment gets you a clear plan and a price with nothing hidden.

Call to book your free assessment, or use the form and we'll call you.

Book Your Free Assessment

No cost. No obligation. An honest answer about what your roof actually needs.

We reply fast, usually the same day. Your info stays private.
Call 250-219-4333 Free assessment